Initial calibration period at the beginning of the contract to verify the performance figures of the supply company and the quality of the assets, which are the measure of the performance and improvement of the contract. Medium-term participation (7 to 15 years) of a private operator in the operation and maintenance of a municipal water and sanitation system, in which the owner seeks to improve service delivery and quality (24/7 water service) and reduce losses and deficits. Contract for the operation and maintenance of water and sewer systems in a levy based on urban performance, related to the reduction of the utility`s deficit each year (reducing leaks and non-revenue connections, increasing revenues through better billing and higher rates) If billing is to be made on behalf of the operator, then the wording must reflect this dispute settlement - contract provides for negotiation, mediation and arbitration. . Owners to provide electricity (increased rates will reset the balance of the contract). In most contracts, the operator will get his own electricity system - an important issue, because electricity is one of the biggest costs for operating a water system. Any additional provisions that could be included: the operators paid a fixed fee - a results-related fee - a percentage of the work for the management of the investment plan and the work. Circumstances in which this contract may be appropriate: the sewer system is flawed and the operator is prepared to exploit only parts of the wastewater assessment system (point 5) - particularly useful: if data or wealth records are unavailable or unreliable before the contract, Significant capital expenditures are needed to improve assets, reduce leakage and increase frequency (with the target of 24/7) Provisions that may not be replicated/ may require further consideration: If the owner is willing to transfer a large liability to the operator in exchange for system improvements. Operators manage and carry out investment work in accordance with an agreed investment programme.

Clear provisions for changes in circumstances and changes (paragraph 20) to operate, manage and maintain municipal water resources (raw and potable) - some of the wastewater resources. Existing workers are transferred (or seconded to the operator) If the incentives are mainly for reducing leakage and not reducing deficits, the text must be modified Experience since the entry into force (including possible changes) / if it is a draft form, whether it has been applied or not:

Initial calibration period at the beginning of the contract to verify the performance figures of the supply company and the quality of the assets, which are the measure of the performance and improvement of the contract. Medium-term participation (7 to 15 years) of a private operator in the operation and maintenance of a municipal water and sanitation system, in which the owner seeks to improve service delivery and quality (24/7 water service) and reduce losses and deficits. Contract for the operation and maintenance of water and sewer systems in a levy based on urban performance, related to the reduction of the utility`s deficit each year (reducing leaks and non-revenue connections, increasing revenues through better billing and higher rates) If billing is to be made on behalf of the operator, then the wording must reflect this dispute settlement - contract provides for negotiation, mediation and arbitration. . Owners to provide electricity (increased rates will reset the balance of the contract). In most contracts, the operator will get his own electricity system - an important issue, because electricity is one of the biggest costs for operating a water system. Any additional provisions that could be included: the operators paid a fixed fee - a results-related fee - a percentage of the work for the management of the investment plan and the work. Circumstances in which this contract may be appropriate: the sewer system is flawed and the operator is prepared to exploit only parts of the wastewater assessment system (point 5) - particularly useful: if data or wealth records are unavailable or unreliable before the contract, Significant capital expenditures are needed to improve assets, reduce leakage and increase frequency (with the target of 24/7) Provisions that may not be replicated/ may require further consideration: If the owner is willing to transfer a large liability to the operator in exchange for system improvements. Operators manage and carry out investment work in accordance with an agreed investment programme.

Clear provisions for changes in circumstances and changes (paragraph 20) to operate, manage and maintain municipal water resources (raw and potable) - some of the wastewater resources. Existing workers are transferred (or seconded to the operator) If the incentives are mainly for reducing leakage and not reducing deficits, the text must be modified Experience since the entry into force (including possible changes) / if it is a draft form, whether it has been applied or not:

Initial calibration period at the beginning of the contract to verify the performance figures of the supply company and the quality of the assets, which are the measure of the performance and improvement of the contract. Medium-term participation (7 to 15 years) of a private operator in the operation and maintenance of a municipal water and sanitation system, in which the owner seeks to improve service delivery and quality (24/7 water service) and reduce losses and deficits. Contract for the operation and maintenance of water and sewer systems in a levy based on urban performance, related to the reduction of the utility`s deficit each year (reducing leaks and non-revenue connections, increasing revenues through better billing and higher rates) If billing is to be made on behalf of the operator, then the wording must reflect this dispute settlement - contract provides for negotiation, mediation and arbitration. . Owners to provide electricity (increased rates will reset the balance of the contract). In most contracts, the operator will get his own electricity system - an important issue, because electricity is one of the biggest costs for operating a water system. Any additional provisions that could be included: the operators paid a fixed fee - a results-related fee - a percentage of the work for the management of the investment plan and the work. Circumstances in which this contract may be appropriate: the sewer system is flawed and the operator is prepared to exploit only parts of the wastewater assessment system (point 5) - particularly useful: if data or wealth records are unavailable or unreliable before the contract, Significant capital expenditures are needed to improve assets, reduce leakage and increase frequency (with the target of 24/7) Provisions that may not be replicated/ may require further consideration: If the owner is willing to transfer a large liability to the operator in exchange for system improvements. Operators manage and carry out investment work in accordance with an agreed investment programme.

Clear provisions for changes in circumstances and changes (paragraph 20) to operate, manage and maintain municipal water resources (raw and potable) - some of the wastewater resources. Existing workers are transferred (or seconded to the operator) If the incentives are mainly for reducing leakage and not reducing deficits, the text must be modified Experience since the entry into force (including possible changes) / if it is a draft form, whether it has been applied or not:

Initial calibration period at the beginning of the contract to verify the performance figures of the supply company and the quality of the assets, which are the measure of the performance and improvement of the contract. Medium-term participation (7 to 15 years) of a private operator in the operation and maintenance of a municipal water and sanitation system, in which the owner seeks to improve service delivery and quality (24/7 water service) and reduce losses and deficits. Contract for the operation and maintenance of water and sewer systems in a levy based on urban performance, related to the reduction of the utility`s deficit each year (reducing leaks and non-revenue connections, increasing revenues through better billing and higher rates) If billing is to be made on behalf of the operator, then the wording must reflect this dispute settlement - contract provides for negotiation, mediation and arbitration. . Owners to provide electricity (increased rates will reset the balance of the contract). In most contracts, the operator will get his own electricity system - an important issue, because electricity is one of the biggest costs for operating a water system. Any additional provisions that could be included: the operators paid a fixed fee - a results-related fee - a percentage of the work for the management of the investment plan and the work. Circumstances in which this contract may be appropriate: the sewer system is flawed and the operator is prepared to exploit only parts of the wastewater assessment system (point 5) - particularly useful: if data or wealth records are unavailable or unreliable before the contract, Significant capital expenditures are needed to improve assets, reduce leakage and increase frequency (with the target of 24/7) Provisions that may not be replicated/ may require further consideration: If the owner is willing to transfer a large liability to the operator in exchange for system improvements. Operators manage and carry out investment work in accordance with an agreed investment programme.

Clear provisions for changes in circumstances and changes (paragraph 20) to operate, manage and maintain municipal water resources (raw and potable) - some of the wastewater resources. Existing workers are transferred (or seconded to the operator) If the incentives are mainly for reducing leakage and not reducing deficits, the text must be modified Experience since the entry into force (including possible changes) / if it is a draft form, whether it has been applied or not: